The French nuclear sector must address three challenges: the country’s energy and industrial sovereignty, the sector’s competitiveness, and the fight against climate change (including electrification). The 2025–2028 Strategic Sector Contract provides the framework for the nuclear revival.
A revival under way since 2022
The Belfort speech set the main orientations for the revival of French nuclear power. Successive Nuclear Policy Councils (CPN) have since confirmed and supplemented them:
- Extension of the existing fleet’s operating life to 60 years and beyond ;
- The EPR2 programme, with three pairs of reactors at Penly, Gravelines and Bugey, a first commissioning scheduled for 2038, and eight additional reactors as an option ;
- Support for small modular reactors and advanced modular reactors (SMRs/AMRs) under France 2030 ;
- Closing the fuel cycle through the development of SFR technology ;
- Renewal of the fuel cycle plants, notably with Orano’s Aval du Futur programme at La Hague (recycling and storage of spent fuel) ;
- Decommissioning of shut-down facilities and radioactive waste management, including deep geological disposal (Cigéo).
The three challenges of the nuclear revival
Industrial performance: building on schedule, within budget and to the expected quality standards (EPR2, SMRs, fleet operation), and building a robust, competitive and collaborative supply chain ;
Skills and employment: a target of 10,000 hires per year (100,000 over ten years, two thirds of them technicians), through initial training, work-study programmes and career transitions, with attention to the attractiveness of nuclear careers and to gender balance ;
Financing: in particular to secure the EPR2 programme estimated at €72.8 billion (2020 values), based on a State-subsidised loan covering 60% of the cost and a 40-year contract for difference, subject to approval by the European Commission and to EDF’s final investment decision, expected at the end of 2026.